Test Heading
and a description here

Verkhne-Munskoye Data

Related News

  • Botswana Diamonds on brink of drilling with Alrosa joint venture 2016-09-09
    Core holes will be drilled on three licences, two on the known kimberlite AK22 in Orapa, two on licence PL 085 also in Orapa and four on licence PL 135 in Gope,
  • Botswana Diamonds JV to begin exploration in Orapa and Gope 2016-09-09
    JSE-listed Botswana Diamonds’ JV with Russian diamond producer Alrosa will begin exploration in the Orapa and Gope areas of Botswana at the end of September.   “The Alrosa/Botswana Diamonds JV will begin an intensive 12-week exploration programme on our ground in Botswana. Core holes will be drilled on three licences, two on the known kimberlite AK22 in Orapa, two on licence PL 085 also in Orapa and four on licence PL 135 in Gope. Earlier work has pinpointed sites we believe may contain new diamondiferous kimberlites,” says chairperson John Teeling. An intensive programme of geophysics and soil sampling will be carried out on the four other licences held in Gope and an Alrosa team of seven specialists will be joined by geologists and support crew from Botswana Diamonds.   The JV is still waiting on final results from the analysis of the 80 t of material recovered from the two large-diameter drillholes on kimberlite AK21 on licence PL 260 in Orapa. 
  • Alrosa recovers 136.24 ct diamond in Russia 2016-08-15
    Russian mining major Alrosa has recovered a formidable 136.24 ct diamond from the Nyurbinskaya kimberlyte pipe, the company revealed on Monday. The gem-quality rough diamond, which was classified as a 3 Black Makeable 1 Сolour, measured 29.32 х 23.88 х 21.9 mm and was one of the largest stones recovered in the Nyurbinskaya pipe’s history, Alrosa advised.
  • Alrosa finds 241.21 ct whopper 2016-06-16
    The world’s largest diamond producer by volume, Russia’s Alrosa has recovered a 241.21 ct rough diamond from the Nyurbinskaya pipe. It is one of the largest rough diamonds recovered in the Russian Federation and the third largest among those found at the Nyurba mining and processing division, the company advised Thursday.
  • Putin approves part disposal of Alrosa stake 2016-05-13
    Russia's ownership heading down towards 33%

Verkhne-Munskoye Information

  • General 2015-05-10
    The deposit consists of three kimberlite pipes. Total reserves of the diamond deposit are more than 38 mln ct, average grade 0.6 ct/t, the average price as of today more than 210 USD/ct. ALROSA plans to bring production at the Verkhne-Munskoye Diamond Field to full design capacity in 2014. A new unit, which will operate according to a rotating scheme and will be under the control and management of the Uchalinsky mining and processing combine, will be built at the field.

Nearby Locations

Top Mining News

  • Ecuador approves EIS for Lundin Gold’s Fruta del Norte project

  • Atalaya’s quarterly copper production doubled as Proyecto Riotinto ramp up continues

  • Aucu delivers more high grade results

  • Trevali expands high-grade Santander deposits, makes new hanging-wall discovery

  • Nordgold launches Bouly operation in Burkina Faso

Latest Mining News

  • Suva Ruda drilling update

  • Anglo American Platinum completes sale Rustenburg

?>