Corunna Downs Data

Corunna Downs Information

  • Project Development 2015-05-23
    The project's location is highly complementary to Atlas' existing activities at the Abydos Mine, and the Abydos haulage road and as such there will be continued exploration focus to evaluate the potential in the project.
  • General 2015-05-10
    The Corunna Downs project is a greenfields exploration area and is important to Atlas due to its proximity to the Mt Webber Project (approximately 35kms ENE) and its ability to either assist Atlas in continuing to grow its Horizon I production or contribute to the critical mass of tonnes required to underpin a Horizon II infrastructure solution.

Related News

  • ASX: Mineral Resources and Ore Reserves at 30 June 2016 2016-09-21
  • Atlas matches price decline with cost savings, narrows loss to A$159m 2016-08-31
    Despite record shipments, Perth-based iron-ore miner Atlas Iron remained in the red in the 2016 financial year, owing to low iron-ore prices. However, the miner narrowed its full-year loss to A$159-million, from A$1.38-billion in 2015, as cost reductions offset price declines.
  • Atlas Iron boosts shipments, lowers costs 2016-01-29
    Iron-ore miner Atlas Iron on Friday reported that December quarter had increased by 10% on the previous quarter, while its full cash costs for the three months fell by 9%. Atlas shipped 3.6-million tonnes of ore in the December quarter, compared with the 3.3-million tonnes in the September quarter, with full cash costs declining from A$58/t to A$54/t, including all contractor cost clawback and profit share.
  • Corunna Downs has potential to produce 4Mt/y – Atlas study 2016-01-05
    A December prefeasibility study (PFS) into iron-ore miner Atlas Iron’s Corunna Downs project has estimated that the project could deliver about four-million tonnes a year of lump and fines direct shipping ore (DSO), over a mine life of between five and six years. The PFS estimated that the project would require a capital investment of between A$35-million and A$40-million, with C1 cash costs estimated at between A$37/t and A$42/t.
  • ASX: Corunna Downs PFS results 2015-12-23

Corunna Downs News

  • ASX: Mineral Resources and Ore Reserves at 30 June 2016 2016-09-21
  • Corunna Downs has potential to produce 4Mt/y – Atlas study 2016-01-05
    A December prefeasibility study (PFS) into iron-ore miner Atlas Iron’s Corunna Downs project has estimated that the project could deliver about four-million tonnes a year of lump and fines direct shipping ore (DSO), over a mine life of between five and six years. The PFS estimated that the project would require a capital investment of between A$35-million and A$40-million, with C1 cash costs estimated at between A$37/t and A$42/t.
  • ASX: Corunna Downs PFS results 2015-12-23
  • ASX: Pre-feasibility Study Underway for Corunna Downs 2015-10-22
  • ASX: North Pilbara Mineral Resource Update 2015-05-27

Nearby Locations

Nearby Location News

  • ASX: Mineral Resources and Ore Reserves at 30 June 2016 2016-09-21
  • ASX: Mineral Resources and Ore Reserves at 30 June 2016 2016-09-21
  • ASX: Mineral Resources and Ore Reserves at 30 June 2016 2016-09-21
  • ASX: Sale of Pilbara Gold Projects Completed 2016-09-15
  • ASX: Talga Completes Sale of Gold Projects In Pilbara 2016-08-25

Top Mining News

  • Ecuador approves EIS for Lundin Gold’s Fruta del Norte project

  • Atalaya’s quarterly copper production doubled as Proyecto Riotinto ramp up continues

  • Aucu delivers more high grade results

  • Trevali expands high-grade Santander deposits, makes new hanging-wall discovery

  • Nordgold launches Bouly operation in Burkina Faso

Latest Mining News

  • Suva Ruda drilling update

  • Anglo American Platinum completes sale Rustenburg

?>