Bouroubourou Data

Bouroubourou Information

  • General 2015-05-10
    The Bouroubourou exploration permit 10332 (Bouroubourou Permit) isheld by AfriGem SL (Afrigem). Pursuant to the terms of a joint venture agreement with AfriGem, Erin holds an 80% interest in the Bouroubourou Permit and is required to sole fund all exploration expenditure until completion of a bankable feasibility study. The Bouroubourou Permit covers an area of approximately 121 km2 and is located approximately 16 kilometres northeast of the Sabodala Gold Mine. Erin has completed regional geological and regolith mapping together with regional soil sampling on an 800 metre by 800 metre grid. Infill soil sampling on a spacing of 120 metres by 40 metres commenced late in 2011 and is continuing over anomalous areas identified in the regional soil sampling programme (red zones). To date two splay structures, the northern hosting extensive artisanal gold workings, have been identified to the east of the tenement. The workings are within sub-vertical quartz vein sets, central to the shear zones. The two lines of artisanal gold workings extend over 500 metres and 300 metres, and occur along a structure which is interpreted to be within the extension of the structural zone which hosts the Sabodala Mine to the south of the permit. Based upon the results of the work completed and geological observations in the field, the gold mineralisation is interpreted to be associated with two northeast trending shear zones which form as splays from the regional structural trend. The first and second-order shear zones/fault-splays to the regional shear zones provide favourable structural settings for gold mineralisation. The mineralised zones currently have a strike potential of around 3 kilometres each and present targets for immediate follow up leading to drill evaluation.

Nearby Locations

Nearby Location News

  • Alecto, Ashanti to jointly develop Mali-based Kossanto project 2016-08-22
    To further develop the 247 00 oz Mali-based Kossanto East gold project, owner Alecto Minerals has signed a nonbinding letter of intent (LoI) with TSX-V-listed Ashanti Gold. The Canadian exploration and development company now has the right to earn a 65% stake in the project by completing a preliminary feasibility study (PFS) within 36 months. Should Ashanti not complete the PFS within the allocated time, it may instead elect to pay $4-million to Alecto within 90 days.
  • Sofia, Senegal: 16m grading 12.33g/t Au from 8m (SFRC073) 2016-08-04
  • Teranga Gold sets new production record 2016-07-29
    Dual-listed Teranga Gold has recorded its “best ever” production for a second quarter, producing 52 540 oz in the three months ended June. This brought the company’s half-year production to 123 267 oz, spurred by its mill throughput surpassing one-million tons for only a third time in the company’s history. Teranga also reported all-in sustaining costs of $968/oz , including all development capital and total cash costs of $619/oz .
  • ASX: Press Release - Technical Report 2016-03-24
  • ASX: Technical Report NI 43-101 2016-03-24

Top Mining News

  • Ecuador approves EIS for Lundin Gold’s Fruta del Norte project

  • Atalaya’s quarterly copper production doubled as Proyecto Riotinto ramp up continues

  • Aucu delivers more high grade results

  • Trevali expands high-grade Santander deposits, makes new hanging-wall discovery

  • Nordgold launches Bouly operation in Burkina Faso

Latest Mining News

  • Suva Ruda drilling update

  • Anglo American Platinum completes sale Rustenburg

?>