Test Heading
and a description here

Ray Data

Nearby Locations

Nearby Location News

  • Copper Fox Announces Results of Permitting Analysis on the Van Dyke Copper Deposit 2016-08-03

    VANCOUVER, BRITISH COLUMBIA--(Marketwired - Aug. 3, 2016) - Copper Fox Metals Inc. ('Copper Fox' or the 'Company') (TSX VENTURE:CUU)(OTC PINK:CPFXF), through its wholly owned subsidiary Desert Fox Van Dyke Co., is pleased to provide the results of an analysis prepared by NV5 Inc. related to the permitting process for the Van Dyke in-situ leaching copper project located in Miami, Arizona.

  • Capstone Files Technical Report for Pinto Valley Pre-Feasibility Study 2016-02-24

    VANCOUVER, British Columbia, Feb. 23, 2016 /PRNewswire/ -- Capstone Mining Corp. ("Capstone") (TSX: CS) has today filed on SEDAR a National Instrument 43-101 compliant technical report titled "Pinto Valley Mine Life Extension – Phase 3 (PV3) Pre-Feasibility Study",...


  • Pinto Valley life increases 2016-01-18
    … but cost profile doesn’t stack up at today’s copper prices
  • Capstone Mining 2015 Production Results 2016-01-13

    VANCOUVER, British Columbia, Jan. 13, 2016 /PRNewswire/ -- Capstone Mining Corp. ("Capstone") (TSX: CS) today announced production results for the three and twelve months ended December 31, 2015. Combined production totalled 26,000 and 92,900 tonnes of copper in the fourth quarter and...


  • Copper Fox Files Van Dyke Technical Report on SEDAR 2015-12-24

    VANCOUVER, BRITISH COLUMBIA--(Marketwired - Dec. 24, 2015) - Copper Fox Metals Inc. ("Copper Fox" or the "Company") (TSX VENTURE:CUU)(OTC PINK: CPFXF) and its wholly owned subsidiary, Desert Fox Copper Inc. ("Desert Fox"), are pleased to report that it has filed on SEDAR a National Instrument 43-101 ("NI 43-101") technical report related to the Preliminary Economic Assessment ("PEA") on its Van Dyke copper project located in Miami, Arizona. The Technical Report titled "NI 43-101 Preliminary Economic Assessment Technical Report for the Van Dyke Copper Project" dated December 18, 2015, was prepared by Moose Mountain Technical Services ("MMTS"). The authors of the report are James (Jim) H. Gray, PEng, Tracey D. Meintjies, PEng, and Susan C. Bird, MSc, PEng of MMTS who are "Qualified Persons" as defined by NI 43-101 standards. The PEA for the Van Dyke project was disclosed in a previous news release dated November 25, 2015.

Ray Information

  • General 2015-05-10
    The Ray Operations consists of a 250,000 ton/day open pit mine with a 30,000 ton/day concentrator, a 103 million pound/year solvent extraction-electrowinning operation, and associated maintenance, warehouse and administrative facilities. Cathode copper produced in the SX-EW operation is shipped to outside customers and the Asarco Amarillo Copper Refinery.

Top Mining News

  • Ecuador approves EIS for Lundin Gold’s Fruta del Norte project

  • Atalaya’s quarterly copper production doubled as Proyecto Riotinto ramp up continues

  • Aucu delivers more high grade results

  • Trevali expands high-grade Santander deposits, makes new hanging-wall discovery

  • Nordgold launches Bouly operation in Burkina Faso

Latest Mining News

  • Suva Ruda drilling update

  • Anglo American Platinum completes sale Rustenburg

?>