Test Heading
and a description here

Pardoo Data

Pardoo Information

  • General 2015-05-10
    The Pardoo Project is located approximately 75km east of Port Hedland. Pardoo was Atlas' first producing iron ore mine, having commenced operations in October 2008. The operation produces a quality low-alumina DSO product from a number of open pits. Ore is mined by a conventional truck-and-backhoe mining fleet, before being crushed and screened on site and delivered to port by covered road trains.The current mining operation at Pardoo consists of a direct shipping ore (DSO) project which has been underway since October 2008.

Nearby Locations

Nearby Location News

  • Pilgangoora, Australia: 27m grading 1.73% Li2O from 47m depth (PLS798) 2016-10-14
  • ASX: New Zones of Thick High Grade Mineralisation Intersected 2016-10-12
  • ASX: Mineral Resources and Ore Reserves at 30 June 2016 2016-09-21
  • DFS confirms Pilgangoora as world-class 2016-09-20
    DFS for Pilgangoora highlights long-life, low-cost, scalable lithium operation
  • ASX: Pilgangoora DFS Confirms World Class Lithium Project 2016-09-19

Pardoo News

  • ASX: Mineral Resources and Ore Reserves at 30 June 2016 2016-09-21

Related News

  • ASX: Mineral Resources and Ore Reserves at 30 June 2016 2016-09-21
  • Atlas matches price decline with cost savings, narrows loss to A$159m 2016-08-31
    Despite record shipments, Perth-based iron-ore miner Atlas Iron remained in the red in the 2016 financial year, owing to low iron-ore prices. However, the miner narrowed its full-year loss to A$159-million, from A$1.38-billion in 2015, as cost reductions offset price declines.
  • Atlas Iron boosts shipments, lowers costs 2016-01-29
    Iron-ore miner Atlas Iron on Friday reported that December quarter had increased by 10% on the previous quarter, while its full cash costs for the three months fell by 9%. Atlas shipped 3.6-million tonnes of ore in the December quarter, compared with the 3.3-million tonnes in the September quarter, with full cash costs declining from A$58/t to A$54/t, including all contractor cost clawback and profit share.
  • Corunna Downs has potential to produce 4Mt/y – Atlas study 2016-01-05
    A December prefeasibility study (PFS) into iron-ore miner Atlas Iron’s Corunna Downs project has estimated that the project could deliver about four-million tonnes a year of lump and fines direct shipping ore (DSO), over a mine life of between five and six years. The PFS estimated that the project would require a capital investment of between A$35-million and A$40-million, with C1 cash costs estimated at between A$37/t and A$42/t.
  • ASX: Corunna Downs PFS results 2015-12-23

Top Mining News

  • Ecuador approves EIS for Lundin Gold’s Fruta del Norte project

  • Atalaya’s quarterly copper production doubled as Proyecto Riotinto ramp up continues

  • Aucu delivers more high grade results

  • Trevali expands high-grade Santander deposits, makes new hanging-wall discovery

  • Nordgold launches Bouly operation in Burkina Faso

Latest Mining News

  • Suva Ruda drilling update

  • Anglo American Platinum completes sale Rustenburg

?>