Test Heading
and a description here

Grande Cache Data

Related News

  • Rinehart’s iron-ore mine won’t reach capacity this year 2016-09-15
    Billionaire Gina Rinehart’s iron-ore producer said its mine in Western Australia won’t reach full capacity this year following issues at its port and processing plant. The target of 55-million metric tons a year is now expected to be reached early in 2017, instead of late this year, Roy Hill Holdings CEO Barry Fitzgerald told reporters Wednesday at the mine in the Pilbara region.
  • Roy Hill to miss target 2016-09-15
    Construction issues blamed for ramp-up delay
  • Chile's Antofagasta reaches output capacity at Antucoya copper mine 2016-09-06
    London-listed Antofagasta's Antucoya copper mine reached its full monthly production capacity of 7 000 t of copper in August, chief executive Ivan Arriagada said at a mining conference on Tuesday. "I'm happy to announce that in August it (the Antucoya mine) reached its nominal monthly production capacity," said Arriagada.
  • APC’s Dartbrook mine has coal resource estimate of 1.2bn tonnes 2016-05-24
    ASX-listed junior Australia Pacific Coal (APC) has identified a total coal resource estimate of 1.2-billion tonnes at its New South Wales-based Dartbrook coal mine, confirming the newly acquired mine as one of the largest underdeveloped coal operations in the Hunter Valley. After last week’s move to acquire a 100% stake in Dartbrook, APC on Tuesday announced that it had commissioned geological consultants JB Mining Services to undertake an independent assessment to ascertain the resource estimate.
  • ASX: Coal Resource Estimate at Dartbrook of 1.2 Billion Tonnes 2016-05-23

Grande Cache Information

  • General 2015-05-10
    The plant has a rated raw coal feed capacity of approximately 700 tonnes per hour. Heavy media cyclones are used for coarse raw coal cleaning and flotation is used for fine raw coal cleaning to produce clean coal products. Run-of-mine (ROM) coal is delivered by truck to an existing ROM coal stockpile. ROM coal is reclaimed using vibratory feeders, located in a reclaim tunnel. The feeders load the ROM coal onto a reclaim conveyor that transfers the coal into the breaker station. Initial coal processing is conducted through the rotary breaker where the coal is sized to minus 500 millimeters. The coal is sized on a vibratory screen at 19 millimetres. Oversize material, mainly rock, is conveyed to an open, on-ground storage pile and then trucked to the existing coarse reject disposal facility. After the removal of the oversize material in the breaker, the plant feed is conveyed to the 1,800-tonne raw coal silo. Raw coal is recovered from the silo by four vibratory feeders onto the coal processing plant feed conveyor, which is equipped with a tramp iron magnet and a belt scale, and conveyed to the desliming section of the processing plant. The raw coal feed is divided and distributed over eight sieve bends that discharge directly to eight desliming screens. The deslimed coarse coal then passes to a mixing box where it is mixed with water and magnetite and fed to eight 600 millimeter diameter heavy media cyclones. The fine coal screen underflow is pumped to a distribution box and then pumped to the froth flotation circuit. The raw coarse coal is separated into clean coal and rejects in the heavy media cyclones. The magnetite media are recovered from each product on drain and rinse screens. The drained coarse clean coal is dewatered in centrifuges and discharged to the clean coal conveyor. The drained coarse reject material is conveyed to the discard bin for removal by truck to the disposal facility. The fine raw coal is separated into clean coal and tailings in a bank of five 8.5 cubic metre capacity flotation cells. Reagents are required for this flotation process. The clean coal froth is passed to three vacuum disc filters for dewatering. The filter cake is then discharged from the disc filters and combined with the clean coarse coal on the clean coal conveyor for transport to the thermal dryer, where the coal is currently dried during winter months. The thermal dryer is located in a separate building adjoining the coal processing plant and fuelled with natural gas fuelled. Dried clean coal from the dryer is then conveyed to the clean coal stockpile. The fine coal refuse from the flotation cells are thickened in a thickener then pumped to the tailings ponds located on the south side of the Smoky River. Clean coal is reclaimed using vibratory feeders, and then transferred by conveyor to a load-out bin for loading into rail cars. After loading, the top surface of the coal is sprayed with a latex solution to inhibit dusting and coal losses during rail transport.

Nearby Locations

Top Mining News

  • Ecuador approves EIS for Lundin Gold’s Fruta del Norte project

  • Atalaya’s quarterly copper production doubled as Proyecto Riotinto ramp up continues

  • Aucu delivers more high grade results

  • Trevali expands high-grade Santander deposits, makes new hanging-wall discovery

  • Nordgold launches Bouly operation in Burkina Faso

Latest Mining News

  • Suva Ruda drilling update

  • Anglo American Platinum completes sale Rustenburg

?>