Test Heading
and a description here

Delta Data

Related News

  • Altura crunches lithium numbers 2016-09-26
    Altura Mining will move to secure financing to build its $A139.7 million Pilgangoora lithium project in the Pilbara in the Pilbara...
  • ASX: Pilgangoora Lithium - DFS Delivers Excellent Results 2016-09-25
  • ASX: Mineral Resources and Ore Reserves at 30 June 2016 2016-09-21
  • ASX: Pilgangoora Lithium Mineral Resource and Ore Reserve Update 2016-09-21
  • ASX: PFS Outlines Compelling 4MTPA Expansion Option 2016-09-19

Delta Information

  • General 2015-05-10
    This loading facility has the capacity to load barges at a rate up to 800 tonnes per hour. Importantly for Delta, the ability to control the process from the ROM delivery point to loading of barges for cargoes provides for maximum flexibility for the product coal supply chain. Coal is transported by 8,000 tonne barges to the offshore loading point of Muara Jawa for transfer to ships varying in size from Handysize to Panamax vessels.

Nearby Locations

Top Mining News

  • Ecuador approves EIS for Lundin Gold’s Fruta del Norte project

  • Atalaya’s quarterly copper production doubled as Proyecto Riotinto ramp up continues

  • Aucu delivers more high grade results

  • Trevali expands high-grade Santander deposits, makes new hanging-wall discovery

  • Nordgold launches Bouly operation in Burkina Faso

Latest Mining News

  • Suva Ruda drilling update

  • Anglo American Platinum completes sale Rustenburg

?>