Test Heading
and a description here

Arcturus Data

Nearby Locations

Arcturus Information

  • Processing 2015-06-23
    Underground ore is processed using a combination of crushing, milling, gravity concentration and a carbon-in-solution/carbon-in-pulp circuit. In 2009 due to political turmoil in Zimbabwe the mine was placed on care and maintenance and production ramp up has commenced.
  • Mining 2015-06-23
    Arcturus Mine has been operating since 1907, and has produced 1.2 million ounces of gold to date. The mine comprises four underground mining operations %u2013 Venus, Gladstone, Ceylon and Viceroy.
  • Geology 2015-06-23
    Arcturus Mine is situated on the southern limb of the Harare greenstone belt. Pay-shoots range from 25 to 200 metres on strike. The mineralised shear zones are characterised by silicification, biotite and K-feldspar alteration. Gold mineralisation is associated with pyrrhotite, arsenopyrite and free gold, contributing up to 10% of current production.

Related News

  • Improved quarter for Metallon 2016-08-11
    Gold output increases for Zimbabwe-focused private company
  • Metallon lifts Q2 production by 9% 2016-08-10
    JOHANNESBURG (miningweekly.com) – Africa-focused Metallon Corporation produced 22 565 oz of gold in the second quarter of this year – a 9% quarter-on-quarter increase – mainly as a result of the performance of its How mine, in Zimbabwe. The higher output comes despite power interruptions that led to Metallon losing 112 hours, or 1 700 oz, of production in the second quarter. 

Nearby Location News

  • Metallon lifts Q2 production by 9% 2016-08-10
    JOHANNESBURG (miningweekly.com) – Africa-focused Metallon Corporation produced 22 565 oz of gold in the second quarter of this year – a 9% quarter-on-quarter increase – mainly as a result of the performance of its How mine, in Zimbabwe. The higher output comes despite power interruptions that led to Metallon losing 112 hours, or 1 700 oz, of production in the second quarter. 
  • Metallon lifts Q2 production by 9% 2016-08-10
    JOHANNESBURG (miningweekly.com) – Africa-focused Metallon Corporation produced 22 565 oz of gold in the second quarter of this year – a 9% quarter-on-quarter increase – mainly as a result of the performance of its How mine, in Zimbabwe. The higher output comes despite power interruptions that led to Metallon losing 112 hours, or 1 700 oz, of production in the second quarter. 
  • Bindura Nickel Financial Results to 31 March 2016 0000-00-00
    Market News alert ASA Resource Group PLC
  • Bindura Nickel Financial Results to 31 March 2016 0000-00-00
    Market News alert ASA Resource Group PLC
  • Quarterly Operations and Explorations Update 0000-00-00
    Market News alert ASA Resource Group PLC

Top Mining News

  • Ecuador approves EIS for Lundin Gold’s Fruta del Norte project

  • Atalaya’s quarterly copper production doubled as Proyecto Riotinto ramp up continues

  • Aucu delivers more high grade results

  • Trevali expands high-grade Santander deposits, makes new hanging-wall discovery

  • Nordgold launches Bouly operation in Burkina Faso

Latest Mining News

  • Suva Ruda drilling update

  • Anglo American Platinum completes sale Rustenburg

?>